Panel design coordinated with electrical heat-tracing requirements
Busbar, earthing and cable-entry arrangements engineered per specification
Network architecture defined for control-system integration
Document register maintained through review and approval cycles
KNPC engineering requirements
Relevant Shell DEP specifications
Approved Inspection and Test Plan
Pre-FAT and FAT coordination
Integrated testing with the Genesis server
Third-party inspection readiness
Type and routine test certificates
Material test certificates
As-built documentation
Calibration and conformity certificates
Ingress-protection documentation