388 kW LT Isolator Panels for TruBoard Cleantech

Contronics was engaged to design, manufacture and supply LT isolator panels for TruBoard Cleantech's Bareta and Balren project sites in Punjab.

Project Requirement

The project required one 388 kW LT isolator panel for each of two Punjab sites, supported by approved drawings, structured quality procedures, secure logistics and on-site commissioning assistance.

Contronics Solution

Contronics delivered an end-to-end panel supply scope covering design and engineering, manufacturing, inspection coordination, testing documentation, packaging, transportation and technical support during commissioning.

Technical Highlights

  • LT isolator panels rated at 388 kW

  • Busbar and isolator arrangement per approved drawings

  • Identical panel configuration across both project sites

  • Transit-protected packaging for road transportation

Let's Build Smarter Power Infrastructure

Talk to our engineering team about your next substation, automation programme or smart-grid rollout.

Contact Form Demo

Approved QAP and drawings

Factory Acceptance Testing

Owner and third-party inspection readiness

Test reports and FAT documentation

Inspection-observation closure reports

Dispatch documentation

Logistics tracking and transit protection

Service-engineer support during commissioning

Project Gallery

Contextual industrial photographs illustrating the type of equipment, manufacturing and testing activities associated with this scope of work.

LT isolator panel assembly

Panel manufacturing line

Testing and inspection

Packaging and dispatch readiness